Tikki Beach.jpg

Tiki Beach

 
 
 

Roof Restructuring & Replacement

The remedial works at this site were undertaken to create a more integrated look with the Kimpton Seafire Resort and Spa, most notably removing of the thatch roof and demolishing the high-pitch roof structure.

We determined that the safest, most efficient manner of removing the existing roof was to reinforce the roof structure and utilising a crane to lift the structure off the building and place it on the. Once the structure was safely on the ground, we were able to disassemble it with minimal fall risk.

Upon safely and efficiently removing the dated roof, we re-framed the new roof, installed standing seam roofs on all 5 additional structures, and re-painted / re-stained all surfaces.

Key Quantities & Scope of Work

  • Highly public project with major safety considerations

  • Extensive inspections and coordination with client’s safety teams

  • Weeks of planning and preparation leading up to lift

  • Engineering services including Crane Plan

  • 8 days of on-site preparation work for 7-minute lift

  • Over 20,000 square feet of painting and staining