caribbean club
Porte-Cochère
The Porte Cochere construction required the building of a levelled foundation at an accurate height to facilitate the installation of off-island prefabricated steel work. All embedment’s were surveyed and were specifically positioned for steel erection.
The roof of the Porte Cochère was built using an up-stand beam with hidden drainage inside the columns, through which rainwater is recycled for watering the surrounding plants. A new driveway made of carefully laid pavers completed this front entrance renovation.
Key Quantities & Scope of Work
Front entrance construction on the #1 hotel on TripAdvisor in the Cayman Islands
Completed with minimum disruption to hotel guests and West Bay Rd. traffic
Coordinated and installed foundations across an active driveway that tied into the existing building’s substructure
Formed and poured concrete beams at height in difficult areas of access